Service Rates
All prices listed do not include government taxes. Prices are subject to government taxes.
Standard site fee includes water and sewage with a 30 amp electrical connection, family and friend pass and winter storage plus HST 13%.
There is also a non-refundable one-time fee for a key card to the entrance gate. Replacement cards are available for a fee.
Standard site fee includes water and sewage with a 30 amp electrical connection, family and friend pass and winter storage plus HST 13%.
There is also a non-refundable one-time fee for a key card to the entrance gate. Replacement cards are available for a fee.
Lots
Starting at $3,400 |
Hydro
$298.91 + PST | 30 Amp |
$372.78 + PST | 30 Amp Premium |
$498.15 + PST | 50 Amp - Single |
$746.53 + PST | 50 Amp - Double |
$1,494.44 + PST | 100 Amp |
Boats & Docks
$150.00 + HST | Boat/Trailer on Property |
$250.00 + HST | Up to 17 Foot Boat |
$275.00 + HST | 17 Foot and Over or Wide |